Tenby new school is located adjacent to the existing primary school in Heywood lane. The new school is a state of the art learning facility with the capacity to school around 450 pupils. To maximise the floor space available to teaching, the mechanical heating and ventilation plant is located on the first floor above the […]
You are browsing archives for
Category: Completed Projects
The Retreats group
Tyr Y Felin Luxury Hotel Roch Castle Penrhiw Hotel GGT Thomas were appointed as the mechanical installer for the Retreats group’s luxury hotels on the St Davids peninsular in Pembrokeshire West Wales. Each location is unique with very different challenges for the mechanical installations. Tyr Y Felin is the largest of the locations, with 3 […]
Prendergast Primary school and day centr...
Prendergast primary school and day care centre was designed by Pembrokeshire county council and constructed in 2007 / 2008. The main contractor was Cottons, with us (GGT Thomas) carrying out the mechanical installation. The heating was provided via a Rehau underfloor heating system. The school also benefited from solar hot water panels to provide a […]
Portfield School
Portfield School located in Haverfordwest, was a dedicated school for children with learning and physical impairment. This was the first school in Pembrokeshire to have a Combined Heat and power (CHP) unit installed alongside the more standard gas boiler heating system. The CHP unit is essentially a gas fired car engine. As the engine runs it […]
Bluestone Holiday village
The Bluestone holiday village consists of detached holiday chalets within the Bluestone holiday complex. Each chalet is linked to a centralised heat distribution network. The heat in the network is provided by 2 large biomass boilers. The heat is circulated via pre-insulated underground pipework to each chalet where is passes through a plate heat exchanger […]